Ets-lindgren 2110 Multi-Axis Positioning Systems (MAPS) Manuale Utente

Navigare online o scaricare Manuale Utente per Apparecchiature Ets-lindgren 2110 Multi-Axis Positioning Systems (MAPS). ETS-Lindgren 2110 Multi-Axis Positioning Systems (MAPS) User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa

Sommario

Pagina 1 - User Manual

Model 2188 Series Multi-Axis Positioning System (MAPS) User Manual

Pagina 2

10 | Introduction Light Duty Mast Medium Duty Mast (shown with optional mount) Optional Items The following items are available as options to the

Pagina 3 - Table of Contents

Introduction | 11 Optional Part Description Part Number Free-Space Mount Kit • Light duty free-space mount kit is included with all light duty ma

Pagina 4

12 | Introduction ETS-Lindgren Product Information Bulletin See the ETS-Lindgren Product Information Bulletin included with your shipment for the f

Pagina 5

Maintenance | 13 2.0 Maintenance Before performing any maintenance, follow the safety information in the ETS-Lindgren Product Information Bullet

Pagina 6

14 | Maintenance Annual Maintenance Perform the following maintenance every 12 months after the MAPS is placed into service: • Use a good quality

Pagina 7 - MODEL 2110 LIGHT DUTY MAPS

Maintenance | 15 MAPS Maintenance Log Item Routine Bi-Annual Annual Routine Bi-Annual Annual Routine Bi-Annual Annual Routine Maintenance

Pagina 8 - MODEL 2115 MEDIUM DUTY MAPS

16 | Maintenance This page intentionally left blank.

Pagina 9 - ° angular span while keeping

Specifications | 17 3.0 Specifications MAPS Electrical Specifications Nominal AC Voltage: 208–230 VAC Input Frequency: 50/60 Hz Current Rating:

Pagina 10

18 | Specifications This page intentionally left blank.

Pagina 11

Installation | 19 4.0 Installation Before connecting any components, follow the safety information in the ETS-Lindgren Product Information Bull

Pagina 12

ii | ETS-Lindgren L.P. reserves the right to make changes to any products herein to improve functioning or design. Although the information in this do

Pagina 13 - 2.0 Maintenance

20 | Installation Reference Point If installing the MAPS in an existing chamber: Remove the absorber from the floor and lower wall areas prior t

Pagina 14

Installation | 21 5. The MAPS drive units are designed to move from the shipping container to the chamber floor as a single unit. If you cannot m

Pagina 15

22 | Installation 9. When all anchor plates are securely mounted, remove the 1/4–20 screws that hold the anchor plates to the base. Discard the

Pagina 16 - 16

Installation | 23 14. Remove the bracket mounted on the drive unit that is attached to cable carrier. Two #6 screws hold the bracket to the unit.

Pagina 17 - 3.0 Specifications

24 | Installation To make sure the MAPS is level with the antennas in the chamber and is accurately centered in the chamber, install the mast(s).

Pagina 18 - 18

Installation | 25 Fit the flexible couplings of the mast and turntable together 3. Install the MAPS mast(s). Line up the flexible couplings and

Pagina 19 - 4.0 Installation

26 | Installation Align laser through the mast mount to the center of the chamber 5. When the knobs are securely in place, place the MAPS syst

Pagina 20

Installation | 27 Laser and tripod on turntable top (Shown with optional dipole mount plate) 6. Mount the laser onto a tripod, and then place i

Pagina 21 - ANCHOR PLATE INSTALLATION

28 | Installation LEVELING AND HEIGHT ADJUSTMENT If during the bore sight process it is determined that the MAPS system must be leveled or the he

Pagina 22 - UPPER DRIVE UNIT REMOVAL

Installation | 29 If installing the MAPS in a pit, mark the amount required to raise the unit up to level. Remove the top of the turntable and be

Pagina 23 - BORE SIGHT

| iii Table of Contents Notes, Cautions, and Warnings ... v1.0 Introduction .

Pagina 24

30 | Installation Position the actuating pins on each side of the limit switch access port 9. Verify the access port is located over the limit

Pagina 25 - Installation

Installation | 31 The MAPS is designed to operate using 208–230 VAC single-phase 50 or 60 Hz power. The branch circuit supplying power to the moto

Pagina 26

32 | Installation Absorber Installation After the MAPS and mast(s) are leveled and bore sight is achieved, position the absorber that surrounds a

Pagina 27

Operation | 33 5.0 Operation Before placing into operation, follow the safety information in the ETS-Lindgren Product Information Bulletin incl

Pagina 28

34 | Operation Parameter Device 1–Turntable Theta Axis Device 2–Mast Upper Rotation Phi Axis S6 191 191 S7 223 223 S8 255 255 Ac 2.0 2.0 OC OFF O

Pagina 29

Warranty | 35 Appendix A: Warranty See the Product Information Bulletin included with your shipment for the complete ETS-Lindgren warranty for yo

Pagina 30

36 | Warranty This page intentionally left blank.

Pagina 31

Assembly Drawings | 37 Appendix B: Assembly Drawings The following assembly drawings are located in the back pocket of the manual: • 111045 • 1099

Pagina 32

38 | Assembly Drawings This page intentionally left blank.

Pagina 33 - 5.0 Operation

EC Declaration of Conformity | 39 Appendix C: EC Declaration of Conformity

Pagina 34

iv | This page intentionally left blank.

Pagina 35 - Appendix A: Warranty

.67 FROM BOTTOMOF GEARBOX FLANGETO TOP OF COUPLING HUB11REF ONLY2827302939TRIM BELT TO LENGTHMATCHDRILL BELT WITHBRACKETSSEE SHEET 2 FOR DETAILS1.INST

Pagina 36 - 36

32 33SEE NOTE 2SEE NOTE 3BOTTOM ASSYGEARBOX ASSYTOP ASSY45409101536123473461331147341816172123242022112619 42444322585435 3332338 33453745144545414548

Pagina 37

1.631.63112519202127186159272224231012161141785313SEE NOTE 1SCREW MUST BOTTOM OUT INTOITEM 14, 2XPART OF LINEAR SLIDE ASSYSEE ASSY 1100734312834INSTAL

Pagina 38 - 38

1 1153109876152SEE NOTE 2SOME PARTS SHOWN IN EXPLODED VIEW FOR PART CLARITY.1.LINEAR SLIDES TO BE SET WITH MOTORBASE ATTACHED TO THEM2. FOR PROPE

Pagina 39

123REFER TO ASSY'S, SUB-ASSY'S, AND KITS FOR OTHER NOTES AND HARDWARE1. NEEDED FOR FINAL ASSY AND INSTALLATION REQUIREMENTS.7.8063.00.1

Pagina 40 - ETS LINDGREN

VIEW OF TABLEW/O WOOD TOP BRACKET ALONG WITH HARDWARE IS USED TO TIE SLIDER ASSY DOWN PRIOR TO CRATING AND BEFORE SHIPPING.1. MOVE SLIDER ASS

Pagina 41

.67 FROM BOTTOMOF GEARBOX FLANGE TO TOP OF COUPLING HUB16REF ONLY27302926122812TRIM BELT TO LENGTHMATCHDRILL BELT WITHBRACKETSSEE SHEET 2 FOR DETAILS1

Pagina 42

39314032153176311011113UPPER ASSEMBLY14 35 4617253421223318201943232416214 38363537 359834425LOWER ASSEMBLYGEARBOX ASSEMBLYSEE NOTE 244464646414646MAT

Pagina 43

THIS DRAWING REPRESENTS THE LOCATIONS OFABSORBER PARTS ON THE MAPS WOODEN DECK.TO BE USED AS REFERENCE ONLY.NOTES:110781109412(LOCATION MAY VARY)10941

Pagina 44

| v Notes, Cautions, and Warnings Note: Denotes helpful information intended to provide tips for better use of the product. Caution: Denotes a hazar

Pagina 45

vi | This page intentionally left blank.

Pagina 46

Introduction | 7 1.0 Introduction The ETS-Lindgren Multi-Axis Positioning System (MAPS™) is designed to perform measurements of spherical ante

Pagina 47

8 | Introduction Part Description Part Number Fiber optic cables, installation hardware, fiber optic feedthrough connectors 110084 MODEL 2115 MEDI

Pagina 48

Introduction | 9 The following steps were taken to minimize potential radio frequency (RF) obstruction or distortions of RF signals from low-direct

Commenti su questo manuale

Nessun commento